Monday, July 30, 2018

Beamed propulsion doable now, and with it space solar power, Page 2: carbon nanotube beam production.

Copyright 2018 Robert Clark
(patents pending)

 In the blog post, Beamed propulsion doable now, and with it space solar power, I discussed microLED's whose extremely high light output can be used for orbital beamed propulsion, space solar power, or laser missile defense. I wondered though if their output could be made even larger by making the light emitters at the nanoscale rather than the microscale.

 Of course for anything at the nanoscale the first thing to comes to mind are the carbon nanotubes because they have so many extraordinary properties. We'll discuss some possible ways to generate the high intensity light via carbon nanotubes. Some of them may also work with nanowires of other types. For each, we'll follow the example of the microLED's of using nanoscale parabolic mirrors to collimate the light thereby forming a more intense beam.

Glow Discharge Light.
One way nanotubes can create light is though electrical breakdown producing an ionization plasma. In general, high voltage passed througn thin wires or though a sharp point electrode can generate a plasma, known as a corona discharge:

Corona discharge.
When the potential gradient (electric field) is large enough at a point in the fluid, the fluid at that point ionizes and it becomes conductive. If a charged object has a sharp point, the electric field strength around that point will be much higher than elsewhere. Air near the electrode can become ionized (partially conductive), while regions more distant do not. When the air near the point becomes conductive, it has the effect of increasing the apparent size of the conductor. Since the new conductive region is less sharp, the ionization may not extend past this local region. Outside this region of ionization and conductivity, the charged particles slowly find their way to an oppositely charged object and are neutralized.

 Or electric arc discharge:

Electric arc.
An electric arc between two nails
An electric arc, or arc discharge, is an electrical breakdown of a gas that produces an ongoing electrical discharge. The current through a normally nonconductive medium such as air produces a plasma; the plasma may produce visible light. An arc discharge is characterized by a lower voltage than a glow discharge and relies on thermionic emission of electrons from the electrodes supporting the arc. An archaic term is voltaic arc, as used in the phrase "voltaic arc lamp".

 The thinner the wires or sharper the point electrodes the more intense the electrical field and the more intense will be the light generated in accordance with Paschen's Law. Because the nanotubes are so thin but at the same time can carry high electrical power, intense plasma generated light can be produced.

Fluorescent Light.
 Fluorescent lamps work by sending an electric current through mercury vapor. This induces UV light to be emitted. The UV interacts with a phosphor on the inner surface of the lamp to emit visible light. The fluorescent lamps could be made at the nanoscale using nanotubes or nanowires. Note that it might even be sufficient to make a UV beam in which case a phosphor would not be needed to make a visible light beam.

Cathode Ray Tube.
 Cathode ray tubes also called vacuum tubes were the primary method of operation for TV's prior to the advent of flat-screen TV's. They work by generating an electron beam and directing it a phosphor covered screen to generated light. Carbon nanotubes are known as efficient electron emitters via application of electric current so can be used to make a CRT at the nanoscale.

Neon Lights.
 Neon lights also work by sending electric current through an inert gas such as neon or xenon. Unlike the fluorescent and CRT cases though it produces directly visible light rather than needing a phosphor.


  Bob Clark






Friday, July 20, 2018

Beamed propulsion doable now, and with it space solar power.

Copyright 2018 Robert Clark
(patents pending)

  A dream of advocates of low cost space access has been beam propulsion of various types, whether laser, microwave, or particle beams. 

This image displays how beamed microwave technology could be used to launch payloads into space. Source: Escape Dynamics



 The problem has been the size of the laser beam installation needed to launch sizable payloads has been prohibitive.

 The standard estimate for how much payload you can send to orbit with laser-propulsion is 1 kg in payload for 1 megawatt (MW) of laser power. See for example this report by the late Jordin Kare:  

Modular Laser Launch Architecture: Analysis and Beam Module Design. 
Final Report 
USRA Subcontract Agreement No. 07605-003-015 
30 April 2004 Revised 18 May 2004 
Dr. Jordin T. Kare 
Kare Technical Consulting 
908 15th Ave. East jtkare@****.*** 
Seattle, WA 98112 206-323-0795 

 By this measure to launch a 5 metric ton capsule payload would require 5 gigawatts of laser power. In a follow up post I'll discuss some methods that might decrease the amount of power required.

 A further consideration about the power requirements is that if done via some type of gas generator these are typically only about 33% efficient in conversion to electricity, so it would actually take 15 gigawatts. This would be like a nuclear power plant installation. Another possibility would be to use large chemical engines such as the SSME's to generate the heat energy which would then be converted to electrical energy. Three SSME's generated in the range of 27 gigawatts. This would suffice for in the range of a 9 metric ton payload.

 It would take about a day to refurbish the engines for another shot, and then there would only be in the range of 100 shots possible based on the reusability of the SSME's. Considering this would be the primary cost and the vehicle itself would be highly reusable this would still result in a substantial reduction in launch cost.

 Another possibility might be the nine engines of the Falcon 9. These also produce in the range of gigawatts of power. They are also intended to be reusable. But reportedly the number of reuses will only be in the few dozen range.

  As I mentioned, the primary impediment to sizable payload laser propulsion has been the costs of the large laser installation. Currently, the costs for lasers are in the range $15 per watt. Then for 5 gigawatts of laser power that would be $75 billion. That's too much development cost for a single launch installation.

 However, a key new advance may bring the “laser”, or sufficient replacement, cost within what is feasible. The key advance is in the realm of microscale LED's that have remarkably high power density per area:

InfiniLED MicroLEDs achieve 300 W/cm2 output density from tiny source.
The MicroLEDs semiconductor manufacturing process includes construction of a
parabolic reflector to enable optimal light control and high efficiency from
micro-meter-sized LEDs.
Published on:Jan 29, 2013
By Maury Wright
https://www.ledsmagazine.com/articles/2013/01/infiniled-microleds-achieve-300-w-cm-sup-2-sup-output-density-from-tiny-source.html

 The report discusses micro-scale LED's whose light output scales up to 300 W per square centimeter, 3 megawatts per square meter. So a gigawatt could be produced from an array 30 meters on a side. 

 Another article on the InfiniLED's:

Products, Materials & Tools | Jan 21, 2013
InfiniLED MicroLEDs achieve Ultra-High Light Intensity.
InfiniLED’s latest MicroLEDs (µLEDs) have produced record optical beam intensity. This new device is capable of producing up to 1mW of light from a single 20µm pixel at 405nm. This is equivalent to a light output density of more than 300 W/cm2 – the highest recorded for a commercially available LED type device.

A cluster of 25 MicroLEDs beside the tip of a needle. The parabolic reflector shape can be seen in the inset close-up
https://www.led-professional.com/products/leds_led_modules/infiniled-microleds-achieve-ultra-high-light-intensity

 From the appearance of these micro-scale LED's, they should permit simple automated production to produce many copies to cover a macro-scale area to generate light even at gigawatt power levels.

  A description of the mode of operation of the microLED:

MicroLED Sources Enable Diverse Ultralow-Power Applications.
Photonics Spectra
Oct 2013
DR. WILLIAM HENRY, INFINILED

Figure 1. This microLED cross section shows total internal reflection leading to high extraction efficiency through a single surface.


Figure 2. A cluster of 25 microLEDs beside the tip of a needle.

https://www.photonics.com/Article.aspx?AID=55014

 However, for laser propulsion to be useful the beam has to be focused on the target spacecraft. This is possible for the coherent light of a laser. However, it turns out what is only really needed is for the light to be collimated, that is, consisting of parallel beams, and the light produced by these microLED arrays is collimated. From the "InfiniLED MicroLEDs achieve 300 W/cm2 output density from tiny source" article:

The MicroLED is built using an LED semiconductor structure and can be
driven like standard LEDs. But the manufacturing process, which includes
etching of a parabolic reflector at the semiconductor level, delivers a
collimated beam like a laser (see the parabolic structure in the nearby
photo). The result is both high-intensity light and high efficiency.
"This device can be seen as a cross-over between the power and collimation
of a laser and the simplicity of an LED. The unique devices enable a range
of applications," said chief commercial officer of InfiniLED, Bill Henry.
"InfiniLED are proud to have achieved the landmark performance of optical
density greater than 300 W/cm2. This was achieved without the need for
external optics indicating the potential for further improvement of the
performance."


 This means the light rays are parallel. But this is what is needed for the light to be focused to a point (Airy disk) using a parabolic mirror. It doesn't really need to be coherent like a laser. Not actually having to make it be a laser inherently makes it a simpler and cheaper system. However, we will need to array many copies of the MicroLED's to create a large beam. But when the pattern is repeated, likely the degree of collimation will be degraded somewhat over the entire size of the array. That needs to be determined. 

 Still, even if there is a lack of collimation over a large array, we can produce a large collimated beam from the individual collimated beams using an optical element called a collimator:

Collimated light.


 There is the question of whether non-coherent light will have worse disperion through the atmosphere. However, this report discusses experimentation that suggests atmospheric dispersion is actually worse for lasers than for noncoherent light generated by LED's. See for instance the video in Fig. 2 on this page:

Optical communications using coherent and non-coherent light. 
http://modulatedlight.org/optical_comms/optical_about.html

  Another possible advantage of just using LED's rather than going for a laser is that LED's can have high efficiency, as much as 80%, though the efficiency of the InfiniLED's isn't specified. Lasers on the other hand typically only have an efficiency of 30%.

  There is also the cost advantage of just using LED's instead of actual lasers. The cost for LED's is about $1 per watt. Then potentially the cost of the beam itself might only $5 billion for the 5 gigawatt installation for a 5 metric ton launcher. This is within the range for the development cost of a new orbital launcher. 

 However, the microLED's are a new development so their cost might be above the $1 per watt level. Still, Apple is expected to start soon on large scale production of microLED's for use in cell phones, tablets, and TV screens. This will tend to drive down costs.

 The large power requirements would be for launching large payloads such as manned capsules. But there is a market for small payloads. In fact, the DoD has funded programs to develop launchers for payloads in the range of 25 kg to 40 kg at a ca. $1 million launch cost. None of the funded programs have succeeded so far but this cost and size range should now be well within the capabilities of laser launch. A 25 kg payload at the 1 MW per kg measure would require 25 megawatts of laser power, or perhaps of 75 megawatts of thermal power if the electrical power required is provided by a gas turbine.

 But gas turbines at this power range are available for sale at the few tens of millions of dollars cost range:

http://nyethermodynamics.com/trader/kwprice.htm

 Since these are designed to operate continually they could provide thousands of shots. They would also satisfy the DoD requirement of "launch on demand".

Laser Defense Application.
 With Iran and North Korea possibly acquiring the capability to deliver nuclear tipped ICBM's, the need for missile defense becomes more urgent. A promising program for this wound up being cancelled:

27 Sep 2017 | 15:11 GMT
Laser Weapons Not Yet Ready for Missile Defense.
Prototype laser weapons can zap drones from the sky. But they won't protect the U.S. from North Korean nuclear missiles.
https://spectrum.ieee.org/tech-talk/aerospace/military/no-quick-laser-missile-defense

 This was a megawatt-class laser carried on a modified 747. However, to be effective it would have to have 20 to 30 times more power than that. But the InfiniLED's can manage 3 megawatts per square meter. So to get a 20 megawatt beam you would only need a 2.5 by 2.5 meter array of InfiniLED's.

 There was also a problem with the power requirements at lightweight as discussed here:

Reasons to Doubt Laser Missile Defense.
ARMS CONTROL NOW
Authored by Ryan Fedasiuk and Kingston Reif on May 14, 2018
https://www.armscontrol.org/blog/2018-05-14/reasons-doubt-laser-missile-defense

 The weight required for the power production had to be decreased almost by a factor of ten to the range of 5 kg per kilowatt. The microLED's themselves would be quite lightweight so the question remains about the power production and conversion to electricity.

 As described here we already have well above this capability for power production/conversion:

Nuclear powered VASIMR and plasma propulsion doable now.
https://exoscientist.blogspot.com/2015/08/nuclear-powered-vasimr-and-plasma.html

See for instance the listed examples here:

Power-to-weight ratio.
https://en.wikipedia.org/wiki/Power-to-weight_ratio

 Both the heat engines in converting thermal energy to mechanical energy and electric generators in converting mechanical to electrical energy are well above the required power to weight ratio.

Space Solar Power Application.
  In this blog post I suggested we have the capability for space-based solar power:

Economical Space Solar Power Now Possible.
http://exoscientist.blogspot.com/2014/04/economical-space-solar-power-now_19.html

 The reason was the huge mass thought to be needed for lofting the required solar cells can be drastically reduced by using nanotube-based mirrors as solar collectors to focus the light on much smaller solar cells. 

 Now with beamed propulsion the cost to orbit is reduced even further, in fact approaching just the energy cost to orbit with multiple launches. With orbital assembly you wouldn't need gigawatt,  multiton launch installations. You could send very many tens to hundreds of kilo mass payloads to orbit to be assembled into the solar collector arrays. With the payloads in this size range you could use gas turbines to provide the power supply to make continuous launches.

 However, a key aspect was left out of that earlier post: the transmission of the power back to Earth. But we now have the capability of making high power collimated light beams at lightweight as well.


    Bob Clark


Tuesday, July 10, 2018

DARPA's Spaceplane: an X-33 version, Page 3.

Copyright 2018 Robert Clark

 In the previous post "DARPA's Spaceplane: an X-33 version, Page 2", I discussed some recent high strength metal alloys that might give the X-33 and VentureStar even lighter weight propellant tanks than originally envisioned. Still, because of the conformal, noncylindrical shape of the tanks, they would still not have the weight efficiency of a cylindrically shaped rocket. Then I'll discuss some methods that will come close to having the weight efficiency of cylindrical tanks.

Multi-tubed Propellant Tanks.
 One possibility would be to achieve the same lightweight tanks as cylindrical ones by using multiple, small diameter, cylindrical tubes. 

 A similar idea is described here:

OCTOBER 1, 2009 | MECHANICAL & FLUID SYSTEMS
Assemblies of Conformal Tanks
Space is utilized efficiently and sloshing is reduced.
This Prototype Assembly of Conformal Tanks was built to demonstrate the feasibility of building such an assembly to fit an approximately toroidal available volume.
https://www.techbriefs.com/component/content/article/tb/techbriefs/mechanics-and-machinery/5780

 You could get the same volume by using varying lengths and diameters of the multiple cylinders to fill up the volume taken up by the tanks. The cylinders would not have to be especially small. In fact they could be at centimeter to millimeter diameters, so would be of commonly used sizes for tubes and pipes.

 The weight of the tanks could be brought down to the usual 35 to 1 ratio for aluminum-lithium hydrogen/oxygen propellant to tank mass. Then the mass of the tanks on the X-33 would be 210,000 lbs/35 = 6,000 lbs, saving 9,200 lbs off the vehicle dry weight. This would allow the hydrogen-fueled X-33 to achieve its originally desired Mach 15 maximum velocity.

 But note that since now the tanks are composed of cylindrically-shaped tubes, we no longer have the problem of the conformally-shaped carbon composite tanks failing. Then we could get in the range of 50 to 1 propellant to tank mass ratio by using carbon composites for the cylindrically-shaped tubes, and we could reduce the dry mass due to the tanks by an additional 2,000 lbs.

 The same multi-tube approach applied to the full-scale VentureStar would allow it to significantly increase its payload carrying capacity. At a 35 to 1 aluminum-lithium ratio of propellant mass to tank mass for cylindrical tanks, the 1,929,000 lbs propellant mass would now require a mass of only 1,929,000/35 = 55,000 lbs for the tanks, a saving of 83,000 lbs off the original tank mass. This could go to extra payload, so from 45,000 lbs max payload to 128,000 lbs max payload.

 But again we could now use carbon-composites for the cylindrical tubes. This would shave an additional 16,000 lbs off the weight of the tanks, and increase the payload now to 144,000 lbs.

 An analogous possibility might be to use a honeycombed structure for the entire internal makeup of the tank. The X-33's carbon composite tank was to have a honeycombed structure for the skin alone. Using a honeycomb structure throughout the interior might result in a lighter tank in the same way as does multiple cylinders throughout the interior.

 For the multi-tube approach and the honeycombed variant there would be a significant problem for maintenance however. As this is intended to be reusable, we would have difficulty examining all the interior parts of the tanks for cracks or punctures. 

 If you removed the many layers of the multi-tube method layer by layer for examination that would involve significant time and expense. Even more importantly by so many times having to physically move one of the layers of tubes you run an increased risk of damaging one of the tubes. 

 One possibility is that since there would be a gap space between one tube and a tube positioned diagonally to it, we could use this space to insert high resolution imaging equipment. It might also work to insert x-ray imaging devices.

Partitioned Propellant Tanks to Save Weight.
  A different approach to getting near cylindrical-tube weight efficiency, might be to model the tanks, viewing them vertically, as conical but with a flat front and back, and rounded sides. Then the problem with the front and back naturally trying to balloon out to a circular cross section might be solved by having supporting flat panels at regular intervals within the interior. 

 The X-33 composite tanks did have support arches to help prevent the tanks from ballooning but these only went partially the way through into the interior. You might get stronger a result by having these panels go all the way through to the other side.
These would partition the tanks into portions. This could still work if you had separate fuel lines, pressurizing gas lines, etc. for each of these partitions and each got used in turn sequentially. A preliminary calculation based on the deflection of flat plates under pressure shows with the tank made of standard aluminum alloy and allowing deflection of the flat front and back to be only of millimeters that the support panels might add only 10% to 20% to the weight of the tanks, while getting similar propellant mass to tank mass ratio as cylindrical tank. 

 Note you might not need to have a partitioned tank, with separate fuel lines, etc., if the panels had openings to allow the fuel to pass through. These would look analogous to the wing ribs in aircraft wings that allow fuel to pass through. You might have the panels be in a honeycomb form for high strength at lightweight that still allowed the fuel to flow through the tank. Or you might have separate beams with a spaces between them instead of solid panels that allowed the fuel to pass through between the beams

 We'll view the X-33 hydrogen tanks standing vertically as conical with flattened front and back and rounded sides. This report on page 19 by the PDF file page numbering gives the dimensions of the X-33 hydrogen tanks as 28.5 feet long, 20 feet wide and 14 feet high:

Final Report of the X-33 Liquid Hydrogen Tank Test Investigation Team.
https://web.archive.org/web/20120127103443/http://alpha.tamu.edu/public/jae/misc/tankreport.pdf

 Call it 9 meters long, 6 meters wide, and 4.3 meters deep for this calculation. I'll simplify the calculation by approximating the shape as rectangular, i.e., uniformly 6 meters wide. Note that the rounded portions of the sides, top, and bottom will be considered separately. I'll call the vertical length of each section x, and the bulkhead thickness h. Since the length of the tank is 9m, the number of sections is 9/x.


 Typically propellant tanks are pressurized in the 20-40 psi range. I'll take it as 30 psi; call it 2 bar, 2x10^5 Pa. Referring to the drawing of the tank, each bulkhead takes part in supporting the internal pressure of the two sections on either side of it. This means for each section the internal pressure is supported by one-half of each bulkhead on either side of it, which is equivalent to saying each bulkhead supports the internal pressure of one section.

 The force on each section is the cross-sectional area times the internal pressure, so 6m*x*(2*10^5 Pa), with x as in the diagram the vertical length of each section. The bulkhead cross-sectional area is 6m*h, with h the thickness of the bulkheads. Then the pressure the bulkheads have to withstand is 6m*x*(2*10^5 Pa)/6m*h = (2*10^5 Pa)*x/h.

 The volume of each bulkhead is 6m*h*4.3m. The density of aluminum-lithium alloy is somewhat less than aluminum, call it 2,600 kg/m^3. So the mass of each bulkhead is (2,600 kg/m^3)*6m*h*4.3m = 67,080*h. Then the total mass of all the 9/x bulkheads is (9/x)*67080*h = 603,720*(h/x).

 Note that additionally to the horizontal bulkheads shown there will be vertical bulkheads on the sides. These will have less than 1/10 the mass of the horizontal bulkheads because the length of each section x will be small compared to the width of 6m, and will have likewise small contribution to the support of the internal pressure.

 The tensile strength of some high strength aluminum-lithium alloys can reach 700 MPa, 7*10^8 Pa. Then the pressure the bulkheads are subjected to has to be less than or equal to this: (2*10^5 Pa)*x/h <= 7*10^8 Pa, so x/h <= 3,500, and h/x => 1/3,500. Therefore the total mass of the bulkheads = 603,720*(h/x) => 172.5 kg. Note we have not said yet how thick the bulkheads have to be only that their total mass is at or above 172.5 kg, for one of the twin rear tanks. It's twin would also require 172.5 kg in bulkhead mass. The third, forward, tank had about 2/3rds the volume of these twin rear tanks so I'll estimate the bulkhead mass it will require as 2/3rds of 172.5 kg, 115 kg. Then the total bulkhead mass would be 460 kg, about 15% of the 3,070 kg tank mass I calculated for the reconfigured X-33.

 This is for the bulkheads resisting the outwards pressure of the sections. Notice I did not calculate the pressure inside the tank on the bulkheads from the propellant on either side. This is because the pressure will be equalized on either side of the bulkheads. However, we will have to be concerned about the pressure on the rounded right and left sides of the tank, and the rounded top and bottom of the tank, where the pressure is not equalized on the outside of the tank.

 Before we get to that, remember the purpose of partitioning the tank was to minimize the bowing out of the front and back sides from the internal pressure. Consider this page then that calculates the deflection of a flat plat under a uniform load:

eFunda: Plate Calculator -- Clamped rectangular plate with uniformly distributed loading.
This calculator computes the maximum displacement and stress of a clamped (fixed) rectangular plate under a uniformly distributed load.
http://www.efunda.com/formulae/solid_mechanics/plates/calculators/CCCC_PUniform.cfm

 In the data input boxes, we'll put 200 kPa for the uniform load, 6 meters for the horizontal distance, .3 m, say, for the vertical distance, and 6 mm for the thickness of the plate. For the vertical distance x I'm taking a value proportionally small compared to the tank width, but which won't result in an inordinate number of partitioned sections of the tank. For the thickness I'm taking a value at 1/1000th the width of the tank, which is common for cylindrical tanks. For the material specifications for aluminum-lithium we can take the Young's modulus as 90 GPa. Then the calculator gives the deflection as only 2.35mm, probably adequate.

 However, we still have to consider what happens to the rounded sides and the bottom and top. Look at the last figure on this page:


Thin-Walled Pressure Vessels.

http://www.efunda.com/formulae/solid_mechanics/mat_mechanics/pressure_vessel.cfm

 It shows the calculation for the hoop stress of a cylindrical pressure vessel. The calculation given is 2*s*t*dx = p*2*r*dx, using s for the hoop stress. This implies, s = p*r/t, or equivalently t = p*r/s. So for a given material strength s, the thickness will depend only on the radius and internal pressure.

 However, what's key here is the same argument will apply in the figure if one of the sides shown is flat, instead of curved. Therefore in our scenario, the rounded sides, top and bottom, which we regard as half-cylinders, will only need the thickness corresponding to a cylinder of their same diameter, i.e., one of a diameter of 4.3m. 

 So the rounded portions actually require a smaller thickness than what would be needed for a cylinder of diameter of the full 6m width of the tank.

 This means the partitioned tank requires material of somewhat less mass than a cylindrical tank of dimension the full width of the tank plus about 15% of that mass as bulkheads.

 The new high strength metal alloys might also save further on this weight. However, we now have to consider the Young's modulus of the alloys, because of the deflection of the plates calculation, and not just the tensile strength.

A Key Advantage of Partitioned Tanks.
 There is an another advantage of using partitioned tanks in addition to the weight savings. A problem with weight growth of the X-33/VentureStar arose in regards to the size of the wings. For stability reasons, you would want the center of gravity (CG) to remain ahead of the center of pressure (CP) during the entire flight. But as the propellant is burned off, the propellant mass near the front will be decreased and this will increase the effect of the heavy engines at the rear on the moving the CG rearward. To deal with this problem during the X-33 development, the wings kept getting larger and larger. But this cancels out the advantage the X-33 had in its dry mass in its original design in not needing heavy wings.

 The original X-33/VentureStar was supposed to look like this:




 But in the later incarnations, it looked like this:


 The added wing size was to move the CP rearward to keep the CG ahead of it. 

 Partitioned propellant tanks are nothing new actually in aerospace. They are quite commonly used on jet airliners to deal with the problem of CG shift as fuel is burned off:

Concorde.
Balancing by Fuel-Pumping.
The Concorde Tank-Schematic:

"1 + 2 + 3 + 4 are the Collector-Tanks, feeding the engines directly. Usually they feed there counterpart engines – but they can be cross-switched to feed more and/or other engines at the same time.
5 + 7 and 8 + 6 are the Main-Transfer Tanks, feeding the 4 Collector-Tanks. Initially 5 + 7 are active. If those are empty 6 + 8 take over (or must be activated from the Engineering Panel!).
5a + 7a are Auxiliary-Tanks (to 5 and 7).
9 + 10 are the Trim-Tanks for balancing forward
11 is the Trim-Tank for balancing afterward"

 Then the partitioned tanks could solve two problems of the dry mass of the X-33/VentureStar: weight growth in the tanks and in the wings.


 Bob Clark

Sunday, June 10, 2018

DARPA's Spaceplane: an X-33 version, Page 2.

Copyright 2018 Robert Clark

 The OldSpace companies had always discounted the viability of reusable launchers on the grounds that the launch market was not enough to pay for it. However, a new market will soon be opening up for hundreds to thousands of launches required for the impending satellite megaconstellations. Now even the OldSpace company ArianeSpace is speaking of transitioning to reusability.

 So with reusability soon to become prevalent we have now further justification for resurrecting the X-33. Boeing supported by a DARPA grant is developing a reusable, spaceplane first stage, the XS-1, then Lockheed with the X-33 would have a competing reusable launcher.

 In the blog post DARPA's Spaceplane:an X-33 version, I discussed that the X-33 used as a reusable first stage has importance beyond that of just a test stage of an operational SSTO, the VentureStar. For the X-33 could be its own operational vehicle, cutting costs in its own right as a reusable first stage.  But intriguingly the problems that originally doomed the X-33 and its SSTO follow-on the VentureStar may also be solvable.

 As discussed in that earlier post, it was the failure of the composite tanks that caused the X-33 program to be cancelled. But some new high strength aluminum alloys may have the comparable lightweight characteristics as carbon composite tanks.

 Carbon composite propellant tanks are a pretty well developed technology, as long as they are cylindrically shaped. But the unusual conformal shape of the composite tanks on the X-33 caused them to fail.

 Carbon composite saves about half-off the weight of standard aluminum tanks. But interestingly some new aluminum alloys have comparable high strength at lightweight as carbon composite and therefore could be used to give the lightweight tanks needed. 

 See for example the graphic:



  The 7075 T6 alloy has nearly twice the strength per weight as the standard 6061 T6 alloy, and the 7068 T6 was nearly 2.5 times better. 

 A consideration as described on that page is that 7075 is 2 to 3 times more expensive than the standard 6061 and the 7068 is 3 to 4 times more expensive. But considering that because of their higher strength, smaller amounts of the material by a factor of 2 to 2.5 would be needed the price difference in practice would not be as great.

 Note also since it was the inability to produce the composite tanks in the X-33 at the needed lightweight that caused the program to be cancelled, existence of the high strength aluminum alloys make the SSTO VentureStar once again viable.

 Development Cost.

 The cost of carbon fiber is about twice that of standard aluminum, so the cost of the tanks with high strength aluminum would not be much more than the cost of the carbon fiber X-33. Since Lockheed would be paying this itself, it might want first to do a smaller version of the X-33.

 In the earlier "DARPA's SpacePlane" post, I suggested a smaller version half-size in linear dimensions of the X-33 might cost ca. $45 million to build. This would test the technology and moreover using it as an upper stage of the X-33 would give a fully reusable system.

   Bob Clark

UPDATE 7/4/2018: 

 I've been informed of other other high strength, lightweight metal alloys that could also allow VentureStar to achieve its goal of a being a reusable SSTO, and allow the X-33 to be able to serve as a low cost reusable first stage.

 The alloys have various strengths and weaknesses. For example some are are just now being experimented with but their measured strength-to-weight ratio is more than 3 times better than standard aluminum. Some are steel alloys which have better weldability than the aluminum alloys, etc.

 For instance in the graphic above, the titanium 6Al-4V alloy is a little better than the 7075 and is already used in rockets for example for solid motor casings.

 There is also a high strength steel alloy, the 17-7 PH stainless steel CH 900:

Re: SpaceX second stage secret sauce?
https://forum.nasaspaceflight.com/index.php?topic=41906.msg1626634#msg1626634

 It has comparable strength-to-weight as the 7068, i.e., nearly 2.5 times better than standard aluminum. It also has better weldability than the aluminum alloys.

 A recent report shows some high strength aluminum alloys such as the 7075 can be 3D-printed:

Engineers Have Found a Way to 3D Print Super Strong Aluminum.
B. Ferguson/HRL Laboratories
by Dom Galeon September 22, 2017 Hard Science
https://futurism.com/engineers-have-found-a-way-to-3d-print-super-strong-aluminum/

 This is useful since the high strength aluminum alloys such as the 7075 have poor weldability. But the conformal shapes of the X-33/VentureStar tanks would be difficult to make without welding.

 Ti 5553 alloy is another ultra strong titanium alloy, even better than the Ti 6Al-4V. It has a max tensile strength in the range of 1,400 MPa. At a density of 4.64 gm/cc, this puts it in strength-to-weight ratio at even better than the 7068 alloy, and nearly 3 times better than standard aluminum:

Processing of a metastable titanium alloy (Ti-5553) by selective laser melting.
November 2016Ain Shams Engineering Journal 8(3)
https://www.researchgate.net/public...nium_alloy_Ti-5553_by_selective_laser_melting

Finally, a titanium alloy known as the Ti185 was long known but it was difficult to produce it so it had uniform strength throughout. A new method of producing it using titanium hydride powder can produce it so it is uniformly strong:

Low-cost and lightweight: Strongest titanium alloy aims at improving vehicle fuel economy and reducing CO2 emissions
April 1, 2016, Pacific Northwest National Laboratory

https://phys.org/news/2016-04-low-cost-lightweight-strongest-titanium-alloy.html

 Approaching 1,700 MPa in tensile strength, it would be 3.5 times better on strength-to-weight than standard aluminum. Because it is made of titanium hydride powder, it may also be possible to make it by 3D-printing, which would solve the problem of producing a conformal shape for the tanks of the X-33/VentureStar.





Thursday, June 7, 2018

Half-size Ariane core stage for a reusable launcher.

Copyright 2018 Robert Clark

 Long-time space advocates will recall back in the late 90's there was a push for large numbers of communication satellites for the purposes of cell-phone communication. This led to the creation of several private launch companies then to serve what was expected to be hundreds to thousands of required launches.

 However, it turned out the great majority of cell-phone communications could be served by terrestrial cell towers. The large satellite constellation plans were then abandoned, and those private launch companies then collapsed.

 But now once again there are renewed plans for satellite megaconstellations containing hundreds to thousands of satellites, such as OneWeb or SpaceX's StarLink. This time it is primarily for high speed internet service. This time there is billion dollar backing for the projects and there have been preliminary launches to test the idea.

 It's very likely now that the projects will take place. For space advocates, an important result of the large numbers of launches required is that it provides a clear advantage for low cost reusable launchers.

 SpaceX always believed reusable launchers could be financially feasible. But other space launch providers were skeptical. They didn't think the number of launches under the current market would pay for reusability.

 But now with the advent of the new megaconstellation plans even previously skeptical Arianespace plans to transition to reusability. See for example the articles here:


 One project Arianspace is planning is called Callisto. It is to be a small sized hydrolox test vehicle to test reusable, vertical landing boosters. It is to be analogous to the SpaceX Grasshopper tests.

 However, unlike the SpaceX Grasshopper that used the original Merlin engines and the same F9 propellant tanks, though perhaps only partially filled, the Callisto plan is to use an entirely newly designed and built stage.

 I see a problem with this. For the money spent on Callisto, it will not be an actual operational vehicle. This mirrors a problem with the X-33 test vehicle that was supposed to test the technologies for an operational SSTO vehicle. But for all the money spent on the X-33, it itself would not have been an operational vehicle.

 I believe this was a mistake. It would have been better if the X-33 itself was to be used as an operational vehicle. It could have been used as a reusable first stage booster to cut costs for a two-stage to orbit system, a la the SpaceX plan:

DARPA's Spaceplane: an X-33 version.

 Then my recommendation is not to repeat the mistake of the X-33 program by instead actually using operational stages to test reusability and vertical landing.

 This could be done with two existing Arianespace stages. The Ariane 5 core stage and the Ariane H10-3 cryogenic upper stage. In both cases you would use partially filled tanks, approx. half-filled so that the stage could lift-off on their single engines.

 For the operational versions, you would make the tanks themselves half-size, instead of half-filling a full-sized tank, to save dry mass, at least for the Ariane 5 core. For the Ariane H10-3 for the upper stage use it might be able to carry its full propellant load dependent on the propellant load on the Ariane 5 core to be able to lift off on its single Vulcain engine.

 Another advantage of this approach is that it would finally provide Europe with an independent manned spaceflight capability.

 There is a key problem that would need to be solved. Discussion on on a space forum was that the Vulcain II is not throttleable. The HM7-B engine used on the Ariane H10-3 upper stage is also not throttleable. Then both engines would need to be upgraded to be throttleable. As support for the idea this should be feasible, it should be noted the original versions of the SpaceX Merlin engines prior to the Merlin 1D were not throttleable. SpaceX has also shown with its "hoverslam" approach to vertical landing, it would not have to have a high degree of throttleability. Probably the degree of throttleability common to liquid fuel engines in the range of 60% would be sufficient.
See discussion here:

A half-size Ariane for manned spaceflight.

 Bob Clark

UPDATE: 6/10/2018

 In the discussion above I forgot a key point. The most important factor in
regards to cost is not the development cost.
The key cost factor is what they would charge per flight for a reusable
launcher. Robert Zubrin made this point insightfully in one of his books. He
recounts that he made the argument for reusable launchers in his former job
with one of the big launch companies.

 He argued that they could cut the cost of launch by an order of magnitude.
The company execs responded: why would we do that? Their view was their
revenue would then be slashed by a factor of ten. They were assuming the
market would still be the same but they would be getting one-tenth the
revenue.

 So the OldSpace companies were acting quite rationally in a business sense
in discounting reusability. They were saying the market was not enough to
make it advantageous to them.

 But if there were a large market then they would make more money making more launchers at the lower price. That is, the price would be reduced by a factor of ten but the number of launches would be increased by more than a factor of ten.

 Also, the importance of the large market and lowered prices for satellite
launches extends beyond that of just the satellite market. By making
launches at such reduced prices, that increases the possible market for
passenger flights to space. So the impending megaconstellation launches may
also bring to fruition the long desired routine passenger flights to space.




Sunday, February 18, 2018

Multi-Vulcain Ariane 6.

Copyright 2018 Robert Clark

 The worldwide space community was amazed by the success at which SpaceX was able to launch the Falcon Heavy and land the two side boosters back at the launch site: 





 This led the current head of ESA Jan Woerner to suggest that ESA should promote reusability for future launchers. But, Woerner argues, the currently planned version of the Ariane 6 using two solid side boosters and with no reusability is so far along it should probably be completed:

EUROPE’S MOVE.
Posted on 11/02/2018 by Jan Woerner
http://blogs.esa.int/janwoerner/2018/02/11/europes-move/

EUROPE’S MOVE, PART 2.
Posted on 15/02/2018 by Jan Woerner
http://blogs.esa.int/janwoerner/2018/02/15/europes-move-part-2/

 However SpaceX is progressing so rapidly with reusability, and reduced costs, that by the time the Ariane 6 is expected to reach full operation in 2023 it's high cost may make it obsolete.

 But in fact a faster, and much cheaper alternative is possible for the Ariane 6 that would have also have the advantage it could be made reusable: and that is to give the Ariane 5 core an additional Vulcain 2 engine so it can lift off without needing the solid side boosters. 

  Based on how much it cost JAXA to add a second cryogenic engine to the H-IIA core this could be done for only a $200 million development cost:

On the lasting importance of the SpaceX accomplishment, Page 3: towards European human spaceflight.
https://exoscientist.blogspot.com/2013/05/on-lasting-importance-of-spacex.html

 This is compared to the multibillion dollar development cost for the Ariane 6 version with side boosters. 

 I had previously written about the possibility of giving the Ariane 5 a second Vulcain engine here:

The Coming SSTO's: multi-Vulcain Ariane.
https://exoscientist.blogspot.com/2013/03/the-coming-sstos-multi-vulcain-ariane.html

 However, that was in the context of producing a SSTO. But SSTO's are still controversial. And in any case it would have a lower payload capacity than the solid booster version of the Ariane 6, and couldn't, in itself, fulfill the important role of launching GEO satellites.

 So I'll discuss the case of giving the Ariane 5 core a second Vulcain engine while keeping an upper stage. I was surprised that my calculation showed this version without side boosters was able to get close to the 6.5 ton to GTO requirement ESA set for the Ariane 6 just with the two liquid stages, no solid side boosters.

 This article discussed the various options that were being considered for the Ariane 6 including a version that added a second Vulcain engine to the Ariane 5 core:

CNES, ASI Favor Solid-Rocket Design For Ariane 6.
By Amy Svitak
Source: Aviation Week & Space Technology
October 15, 2010

You see it only lists 2,200 kg to GTO with the two stage H2C all-liquid configuration of the Ariane 6.

 And even more surprisingly, my calculation shows my two-stage version could get the high GTO payload without using the expensive new upper stage being planned for the Ariane 6 with the new Vinci engine. It could do it with an already existing cryogenic Ariane H10 upper stage.

 This indicates why the development cost for this version would be so low: no new solids need be developed, already existing Vulcain 2 engines are used, no new expensive upper stage and Vinci upper stage engine need be developed, and already existing Ariane upper stages are used.

 I'll use Dr. John Schilling's launch performance calculator to estimate the payload possible:

Launch Vehicle Performance Calculator.
http://www.silverbirdastronautics.com/LVperform.html

 Use publicly available sources for the specifications of the Ariane 5G core, Vulcain 2 engine, and Ariane H10 upper stage to enter in data into the Schilling calculator. The calculator takes the vacuum values for the Isp and thrust even for first stage engines, since it already takes into account the diminution of these values at sea level. Then with two Vulcain engines the input page looks like this:



 Some quirks of the Schilling calculator you need to be aware of though if you use it. First, always select "No" for the "Restartable Upper Stage" option, otherwise the payload will be reduced. Second, always set the "Inclination" to match the launch site latitude otherwise the payload will be reduced.

 Note that while the thrust indicated for the first stage at 2,700 kilonewtons (vacuum) is well above the rocket gross mass, the sea level thrust for the two Vulcains is about 190,000 kilogram-force. With payload, this would not be enough to lift off. A couple of solutions. One would be to change the mixture ratio at lift off to increase the oxidizer to fuel ratio. This decreases Isp, but increases thrust. Another possibility is that liquid fuel engines can be run at some percentage above their rated values. For instance the space shuttle main engines could be run at 9% above their rated thrust values and the latest version of the SpaceX Merlin engines run at about 15% above the Merlins rated thrust value.   Another possibility would be to reduce the propellant load. I'll look at this last solution in a moment.

 In any case with these specifications the calculator gives this payload to LEO:



 Now to get the GTO payload, change the "Apogee" entry from 185 km to 35,000 km. Then the calculator gives the result:



Altitude Compensation case. 
 We can get even better performance by using altitude compensation on the Vulcains. As discussed on this blog various methods exist to give standard bell nozzle engines, altitude compensating nozzles. These new additions would not be heavy or expensive.

 As shown by the RL10-B2 engine, with a nozzle extension a hydrogen-fueled engine can get a vacuum Isp in the range of 465 s. So change the first and second stage Isp's to 465 s and increase the vacuum thrust proportionally. Then the payload for the LEO case would be:



  And the payload to GTO would be:



 This indicates the importance of altitude compensation even for multi-stage vehicles. The payload can be increased in the range of 25%. However, it could be argued the Schilling calculator was not formulated to deal with the altitude compensating case, so these estimates are less reliable. A legitimate concern. Accurate trajectory simulations need to be done to determine if altitude compensation can really increase payload to this extent even with multi-stage rockets.

Reduced Propellant Case.
 As mentioned above another method to deal with the lift off thrust not being able to loft the rocket with payload, is to reduce the propellant load. In fact the currently adopted version of the Ariane 6 is planned to reduce the propellant on the core down to 140,000 kg.

 If we do this to our all liquid version, this brings the LEO payload to 10,430 kg  and the GTO payload to 4,890 kg.
 And with the altitude compensation, the LEO payload comes to 12,800 kg and alt. comp. GTO payload to 6,370 kg.

And Yet Even More.
 Beyond the importance of giving Europe a reusable, low cost launcher, there is also the fact that being all liquid-fueled, no solid motor boosters, Europe now would have an orbital launcher that could be used for manned spaceflight. Europe would finally have its own independent manned spaceflight capability.

   Bob Clark

Could Blue Origin develop a lander for Artemis III?

Copyright 2025 Robert Clark SpaceX is coming under increasing criticism for its delay in developing the Starship lunar lander: U.S. Is Losin...