Showing posts with label lunar mining. Show all posts
Showing posts with label lunar mining. Show all posts

Saturday, December 1, 2012

SpaceX Dragon spacecraft for low cost trips to the Moon, page 3: Falcon Heavy for BEO test flights.

Copyright 2012 Robert Clark

The Falcon Heavy is planned to be tested by SpaceX by 2014. By using the Early Lunar Access (ELA) architecture we could have a return to the Moon by 2019, using either the Falcon Heavy or the SLS, as described in the blog post "SLS for Return to the Moon by the 50th Anniversary of Apollo 11". Note this would also be by the 2020 timetable set by the Vision for Space Exploration(VSE).
 This ELA architecture could be implemented either using either the Dragon capsule or the NASA Space Exploration Vehicle (SEV). The SEV is intended to be used for BEO missions perhaps for mission durations up to 28 days long with two crew members. Then the first Falcon Heavy missions would provide means for testing unmanned the SEV for BEO missions to the lunar surface, the Lagrange points or to near Earth asteroids.
 SpaceX needs to perform the test flights for the Falcon Heavy so they would pay for the costs of the launch themselves. For the lunar flights as discussed in the "SpaceX Dragon spacecraft for low cost trips to the Moon" post, the two Centaur-like upper stages might require in the range of $30 million dollars each. There would be an extra cost for the SEV but for these first test missions we might only use the prototype test vehicles now undergoing field tests with NASA's Desert RATS program. These prototype vehicles only cost in the few hundred thousand dollar range. This would put the cost to NASA in the low cost Discovery-class mission range.

2011 Desert RATS Overview
 Since these are to be unmanned test flights, ideal would be to "man" them with two Robonauts. This would dovetail nicely with the Johnson Space Center's Project Morpheus plan to send Robonaut to the lunar surface.  In regards to NEO missions, this is one of the planned uses for the SEV. For the manned asteroid flights NASA was considering, the mission time ranges were above 90 days. That would be unrealistic for flights just using the SEV alone. However looking at the Near-Earth Object Human Space Flight Accessible Targets Study (NHATS) page there are NEO missions with duration times of 34 days or less at stay times of greater than 8 days that could correspond to under 28 day mission times if we limit the stay time to a day or so.


      Bob Clark

Wednesday, October 24, 2012

SpaceX Dragon spacecraft for low cost trips to the Moon, page 2: Comparison to 'Early Lunar Access'.

 Copyright 2012 Robert Clark

 Early Lunar Access lander stage.


 The Early Lunar Access [1],[2], proposal of General Dynamics came as quite a surprise to those in the industry when it was first proposed in the early 90's. It suggested manned lunar missions at half the mass needed to LEO and at 1/10th the cost of the Apollo missions.
 It was based on using existing launchers with small upgrades to keep costs low. The only part of it that was technically doubtful at the time was that you could get the lightweight 2-man capsule they were proposing at only a ca. 3.7 mT crewed mass.
 Based on such a small sized capsule, they were able to get a manned mission to the Moon at only about 52 mT required to LEO using all cryogenic space stages. However, the 7-man Dragon capsule at a ca. 4mT dry mass suggests this is indeed feasible.
 It is also interesting the architecture they were proposing for low costs was similar to what I suggested for the SpaceX Dragon via the Falcon Heavy launcher. It would use a single capsule to take the crew all the way from LEO to the Moon's surface and back again, i.e.,no separate lunar crew module. Also it would use as I suggested a single lander stage to take the crew capsule from low lunar orbit to the Moon's surface and then all the way back to LEO, rather than linking up with a return stage waiting in lunar orbit for the return.
 This gives further confidence in the feasibility of the lunar lander plan using the Dragon with Centaur-style stages launched on the 53 mT Falcon Heavy.


  Bob Clark

1.)Encyclopedia Astronautica
Early Lunar Access.

2.)Lunar Base Studies in the 1990s.
1993:  Early Lunar Access (ELA).
by Marcus Lindroos
(a typo on this page: the payload adapter mass should
be 2,000 kg instead of 6,000.)


Wednesday, May 2, 2012

SpaceX Dragon spacecraft for low cost trips to the Moon.

Copyright 2012 Robert Clark
OTV - 1986 
Space Tug depicted in NASA's 'Pioneering Space Frontier'. A space tug from the 1986 Pioneering the Space Frontier policy report. 
Credit: NASA via Marcus Lindroos
http://astronautix.com/o/otv.html


 SpaceX has said two Falcon Heavy launches would be required to carry a manned Dragon to a lunar landing. However, the 53 metric ton payload capacity of a single Falcon Heavy would be sufficient to carry the 40 mT (Earth departure stage + lunar lander) system described below. This would require 30 mT and 10 mT gross mass Centaur-style upper stages. This page gives the cost of a ca. 20 mT Centaur upper stage as $30 million:

Centaur IIA.

 A 30 mT Centaur would be somewhat more than this and a 10 mT Centaur-style stage would be somewhat less, so the total for both about $60 million. Note it could also be done with two 20 mT Centaurs at slightly reduced performance.

 The 53 mT to LEO capacity of the Falcon Heavy would also allow large lunar cargo transport using two of the 20 mT gross mass Centaurs that already exist either using the Dragon to carry the cargo or by carrying somewhat more cargo just within a lightweight container.

 An important cargo delivery to the Moon would be in-situ resource utilization (ISRU) equipment, specifically for producing propellant from the water discovered to lie within the shadowed craters near the lunar poles. Elon Musk has said a key goal of his is to mount a manned Mars mission within 1 to 2 decades. Such a mission could be mounted more cheaply if the large amount of propellant required did not have to be lofted from the Earth's deep gravity well but could be taken from the Moon.

 Another important cargo delivery would be to carry a rover that could do a sample return mission from the near polar locations. Lunar orbiter observations suggest there may be valuable minerals concentrated in such locations:

SCIENCE -- October 21, 2010 at 2:05 PM EDT
Moon Blast Reveals Lunar Surface Rich With Compounds.
BY: JENNY MARDER
"There is water on the moon ... along with a long list of other compounds,
including, mercury, gold and silver. That's according to a more detailed
analysis of the chilled lunar soil near the moon's South Pole, released as six papers by a large team of scientists in the journal, Science Thursday."

 If these tentative detections could be confirmed then that could possibly form a commercial market for flights to the Moon.

 In this vein note there is even stronger evidence for large amounts of valuable minerals on asteroids. Observations suggest that even a small size asteroid could contain trillions of dollars (that's trillions with a 't') worth of valuable minerals:

Riches in the Sky: The Promise of Asteroid Mining.
Mark Whittington, Nov 15, 2005

 It is quite important to note then that since the delta-V requirements to some near Earth asteroids is less than that to the Moon, that the sample return version of the lunar lander could also be used to return samples from the near Earth asteroids. If these asteroidal detections could be definitively confirmed by a sample return mission then that would provide further justification for private investment in lunar propellant production installations.

 SpaceX expects to launch the first Falcon Heavy in 2013. Because the required Centaur stages already exist it is possible that a lunar lander could be formed from such mated together stages within this time frame at least for a unmanned cargo version.

 It is important though that such a lander be privately financed. Because the required stages already exist I estimate a lander could be formed from them for less than a $100 million development cost. This is based on the fact that SpaceX was able to develop the Falcon 9 launcher for about $300 million development cost. And this required development of both the engines and the stages for a 300 mT gross mass and 30 mT dry mass launcher. But for this lunar lander, the engines and stages already exist for a total 40 mT gross mass and 4 mT dry mass system.

 If the system were to be government financed then based on the fact that SpaceX was able to develop the Falcon 9 for 1/10th the development cost of usual NASA financed systems, the cost of the lander would suddenly balloon to a billion dollar development.

 Note that while the evidence for valuable minerals in the lunar shadowed craters is not yet particularly strong, the evidence for such minerals in the asteroids is. So there is a strong financial incentive for forming such a lunar lander as it could also be used for the asteroidal lander.

  But asteroidal mineral retrieval flights could be launched much more cheaply if the propellant could be obtained from the Moon. Then there is a strong financial incentive to produce ISRU installations on the Moon which would require lunar return missions from the shadowed crater regions to assess the best means of harvesting this lunar water for propellant. If such return missions also confirm the presence of valuable minerals in the shadowed craters then that would be like icing on the cake for justification of private investment in such missions.


CALCULATIONS.
  The Orion spacecraft and Altair lunar lander intended for a manned Moon mission are large craft that would require a heavy lift launcher for the trip. However the Dragon capsule is a smaller capsule that would allow lunar missions with currently existing launchers.

 The idea for this use would be for it to act as a reusable shuttle only between LEO and the lunar surface. This page gives the dry mass of the Dragon capsule of 3,180 kg:

SpaceX reveals first Dragon engineering unit.
DATE:16/03/07
By Rob Coppinger

 The wet mass with propellant would be higher than this but for use only as a shuttle between LEO and the Moon, the engines and propellant would be taken up by the attached propulsion system. With crew and supplies call the capsule mass 4,000 kg.
On this listing of space vehicles you can find that the later versions of the Centaur upper stage have a mass ratio of about 10 to 1:


 The Isp's given for the RL-10A engines used on these stages are around 450 s, but an updated version with a longer, extensible nozzle has an Isp of 465.5 s:

RL10B-2.

 This page gives the delta-V's needed for trips within the Earth-Moon system:

Delta-V budget.
Earth–Moon space.

 The architecture will be to use a larger Centaur upper stage to serve as the propulsion system to take the vehicle from LEO to low lunar orbit. This larger stage will not descend to the surface, but will remain in orbit. A smaller Centaur stage will serve as the descent stage and will also serve as the liftoff stage that will take the spacecraft not just back to lunar orbit, but all the way to back to LEO. The larger Centaur stage will return to LEO under its own propulsion, to make the system fully reusable. Both stages will use aerobraking to reduce the delta-V required to return to LEO.

 For the larger Centaur, take the gross mass of the stage alone as 30,000 kg, and its dry mass as 1/10th of that at 3,000 kg. For the smaller Centaur stage take the gross mass as 10,000 kg and the dry mass as 1,000 kg. The "Delta-V budget" page gives the delta-V from LEO to low lunar orbit as 4,040 m/s. In calculating the delta-V provided by the larger Centaur stage we'll retain 1,000 kg propellant at the end of the burn for the return trip of this stage to LEO: 465.5*9.8ln((30,000 + 10,000 + 4,000)/(3,000 +10,000 + 4,000 + 1,000)) = 4,077 m/s, sufficient to reach low lunar orbit. For this stage alone to return to LEO, 1,310 m/s delta-V is required. The 1,000 kg retained propellant provides 465.5*9.8ln((3,000 + 1,000)/3,000) = 1,312 m/s, sufficient for the return.

 The delta-V to go from low lunar orbit to the Moon's surface is 1,870 m/s. And to go from the Moon's surface back to LEO is 2,740 m/s, for a total of 4,610 m/s. The delta-V provided by this smaller Centaur stage is 465.5*9.8ln((10,000 + 4,000)/(1,000 + 4,000)) = 4,697 m/s, sufficient for lunar landing and the return to LEO.
The RL-10 engine was proven to be reusable for multiple uses with quick turnaround time on the DC-X. The total propellant load of 40,000 kg could be lofted by two 20,000+ kg payload capacity launchers, such as the Atlas V, Delta IV Heavy, Ariane 5, and Proton.

 The price for these launchers is in the range of $100-140 million according to the specifications on this page:

Expendable Launch Vehicles.

 Two would be in the range of $200-$280 million. The Dragon spacecraft and Centaur stages being reusable for 10+ uses would mean their cost per flight should be significantly less than this. This would bring the cost into the range affordable to be purchased by most national governments.

 Still, it would be nice to reduce that $200 million cost just to bring the propellant to orbit. One possibility might be the heavy lift launchers being planned by NASA. One of the main problems in deciding on a design for the launchers is that there would be so few launches the per launch cost would be too high. However, launching of the propellant to orbit for lunar missions would provide a market that could allow multiple launches per year thus reducing the per launch cost of the heavy lift launchers. For instance, the Direct HLV team claims their launcher would cost $240 million per launch if they could make 12 launches per year:

JULY 23, 2009
Interview with Ross Tierney of Direct Launch by Sander Olson.

 This launcher would have a 70,000 kg payload capacity. However, if you removed the payload fairing and interstage and just kept the propellant to be launched to orbit in the ET itself and considering the fact that the shuttle system was able to launch 100,000+ kg to orbit with the shuttle and payload, it's possible the propellant that could be launched to orbit could be in the range of 100,000 kg. Then the cost per kg to orbit would be $2,400 per kg, or about a $100 million cost for the propellant to orbit.

 Reduction of the per launch cost for the heavy lift launchers would then allow affordable launches of the larger spacecraft and landers for lunar missions.


  Bob Clark


Could Blue Origin develop a lander for Artemis III?

Copyright 2025 Robert Clark SpaceX is coming under increasing criticism for its delay in developing the Starship lunar lander: U.S. Is Losin...